- 13 May 2025: SARAS MkII Annual Surveillance Audit of CMERI for the year 2025 with Dr Anupam Sinha, Dr Siva Subbarao Patange , Dr Vinay and Dr Manabendra De. Review of Design Organisation Interface Document between CSIR-CMERI and CSIR-NAL.
- 02 June 2025: Attended training program on June 2, 2025- Hybrid session on Trademarks/ Copyright by Remfry & Sagar and Partners
- 02 June 2025: Initiated the creation of the BIS standards for Felxible push pull cable for turboporp engine control, as a part of Global tender document preparation for engine control cables.
- 9 June 2025: Interacted with Thriveni earthmovers through PWC representative Sandeep and Thriveni earthmovers pilot Mr Ramkumar for collecting information about PW PT6A 67P engine mechanical control system on the PC12 NG aircraft. Submitted report on the study to TTL on 18 June 2025. PT6A67P engine does not have propeller control cable. CSU prop governor is fixed.
Tuesday, May 13, 2025
APAR April 1 2025 to 2026 March 31
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment